Project ID: 67232

Chinese Government provides RMB 30 million interest-free loan for Phase 1 of Campus Telephone Network Project (Linked to Project ID#65100 and Project ID#85254)

Commitment amount

$ 7946015.602074255

Adjusted commitment amount

$ 7946015.6

Constant 2021 USD

Summary

Funding agency [Type]

China Ministry of Commerce [Government Agency]

Recipient

Syria

Sector

Education (Code: 110)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2005-01-01

Planned start

2003-01-01

Planned complete

2005-12-31

Actual complete

2006-06-13

NOTE: Red circles denote delays between planned and actual dates

Geography

Description

According to a dataset of foreign-financed projects that the Syrian Planning Commission (SPC) provided to UNDP Syria in May 2011, the Chinese Government provided an RMB 30 million ($4,416,000) interest-free loan (captured in Project ID#67232) and an RMB 4 million (USD 588,800) grant (captured in Project ID#65100) to the Government of Syria’s Ministry of Higher Education in 2003 for Phase 1 of the Campus Network Project. The purpose of the project was to connect the colleges and directorates of the University of Damascus via an internal telephone network and equip students with a prepaid telephone card for reaching out to their families living in the city. ZTE Corporation was the contractor responsible for implementation. The originally anticipated project implementation start date was January 1, 2003 and the originally anticipated project implementation end date was December 31, 2005. The first telephone site supported by this project was established at the end of 2005, The project was officially completed and handed over to the local authorities on June 13, 2006. The Chinese Government also financed Phase 2 of Campus Network Project (as captured in Project ID#85254).

Additional details

This project is also known as the Campus Network Project. The Chinese project title is 校园网项目. The Arabic project title is مشروع توسعالشبكة الهاتفية or مشروع الشبكة الهاتفية التي تربط الجامعة بالمدينة الجامعية. Since loan terms for the interest-free loan are unavailable, AidData has set maturity period to 20 years by default and grace period to 10 years by default per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity period of interest-free loans is 20 years, with a drawdown period of 5 years, grace period of 5 years, and repayment over 10 years. AidData treats the drawdown period as providing 5 years of additional grace.

Number of official sources

7

Number of total sources

13

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Ministry of Higher Education of Syria [Government Agency]

Implementing agencies [Type]

ZTE Corporation [State-owned Company]

Loan Details

Maturity

20 years

Interest rate

0.0%

Grace period

10 years

Grant element (OECD Grant-Equiv)

62.9902%

Bilateral loan

Interest-free loan

Investment project loan