Chinese Government provides $22.95 million USD loan for 29 MW Solar Power Project (Linked to Record ID#54762)

Commitments (Constant USD, 2023)$24,010,253
Commitment Year2015Country of ActivityCubaDirect Recipient Country of IncorporationCubaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2015
Start (actual)
Nov 8, 2016
End (actual)
Apr 26, 2018

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project involved the construction of a 4 MW solar farm (Pinar 220 A2 photovoltaic solar park) in Pinar del Rio province and a 5 MW solar power plant in Yaguaramas within Cienfuegos province. More detailed locational information can be found at https://www.openstreetmap.org/way/522591426 and https://www.openstreetmap.org/way/321076558 and https://www.industryabout.com/country-territories-3/1750-cuba/solar-energy/51905-pinar-220-a2-solar-power-plant and http://www.xinhuanet.com/english/2019-10/20/c_138488420.htm and https://www.openstreetmap.org/way/580476824

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Cuba

Implementing agencies

NGO/CSO/Foundations

  • China Qiyuan Engineering Cooperation

Private Sector

  • China Hydropower Engineering Consulting Group Co./China Hydropower Engineering Consulting Group Kunming Survey and Design Institute

Loan desecription

Chinese Government provides $22.95 million USD loan for 29 MW Solar Power Project

Interest typeUnknown

Narrative

Full Description

Project narrative

On March 2, 2015, the Chinese and Cuban governments signed an Exchange of Letters for the implementation of solar power station projects. Cuba's Ministry of Energy and Mines planned to install photovoltaic facilities, capable of 29 MW in total, on five Cuban solar farms through a $24,590,000 grant and $22,950,000 soft loan, both provided by the Chinese Ministry of Commerce (MOFCOM). The grant is captured in linked Record ID#54762. The project management unit is China Qiyuan Engineering Design and Research Institute Co., Ltd., and the project general contractor is China Hydropower Engineering Consulting Group Company. The first stage of this project involved the construction of two photovoltaic plants with a combined capacity of 9 MW. The pair includes a 4 MW solar farm in the Pinar del Rio province and a 5 MW plant in Cienfuegos province, the latter being the largest facility of its kind in Cuba. Construction of the power plants began on 18 November, 2016 and was completed and successfully passed technical acceptance on 12 April, 2018. On 26 April, 2018, the ceremony for the completion and handover of the photovoltaic power plants was held at the site of the 5MW project in the town of Yaguaramas, Cienfuegos Province, Cuba. Solar parks will continue to be constructed in the Cienfuegos province until 2030. China will provide the technology while Cuba will take care of the physical construction.

Staff comments

1. This project has been coded with Implementation status, as only 9 MW of the expected 29 MW has been completed. It is not known whether all of the solar projects being constructed in Cienfuegos are being financed by China but the ones that are already complete have had Chinese participation. 2. The Chinese project title is 援古巴太阳能电站. 3. Other sources have quoted the total capacity for this project as 21 MW (See: 2016/17 Knowledge Sharing Program (Industry & Trade) with Cuba and China entrega a Cuba dos parques de paneles solares para generar energías limpias).