Bank of China contributes $1 billion to $1.389 billion syndicated buyer’s credit loan for 1000MW Cilacap Power Plant Phase 3 Expansion Project (Linked to Record ID#34801, #34748, #61465)

Commitments (Constant USD, 2023)$1,090,721,573
Commitment Year2016Country of ActivityIndonesiaDirect Recipient Country of IncorporationIndonesiaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Sep 19, 2016
Start (planned)
Sep 19, 2016
Start (actual)
Nov 17, 2016
End (planned)
Dec 19, 2019
End (actual)
Nov 9, 2019

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to install a fourth unit (with 1000MW of power generation capacity) at the Jawa-8 Power Plant (also known as the Cilacap Power Station). The plant is located in the villages of Karangkandri, Menganti and Slarang within Kesugihan subdistrict, Cilacap Regency, and Central Java province. More detailed locational information can be found at https://www.openstreetmap.org/way/92905337#map=17/-7.68490/109.09312

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Commercial Banks

  • Bank of China (BOC)

Cofinancing agencies

State-owned Banks

  • PT Bank Rakyat Indonesia (Persero) Tbk

State-owned Policy Banks

  • China Development Bank (CDB)

Receiving agencies

Joint Venture/Special Purpose Vehicles

  • PT Sumber Segara Primadaya (S2P)

Implementing agencies

State-owned companies

  • China Chengda Engineering Co. Ltd
  • PT Perusahaan Listrik Negara (Persero) (PLN)

Loan desecription

Bank of China and CDB contribution to $1.389 billion syndicated buyer’s credit loan for 1000MW Cilacap Power Plant Phase 3 Expansion Project

Interest typeUnknown

Narrative

Full Description

Project narrative

On September 19, 2016, PT Sumber Segara Primadaya (S2P) — a joint venture of PT Sumberenergi Sakti Prima (SSP) and PT Pembangkit Jawa Bali (PJB) — signed a $1.398 billion syndicated buyer’s credit loan with Bank of China, China Development Bank (CDB), and Bank Rakyat Indonesia for the 1000MW Cilacap Power Plant Phase 3 Expansion Project. SSP holds a 51% ownership stake in S2P and PT Pembangkit Jawa Bali (PJB) — a subsidiary of Perusahaan Listrik Negara (PLN), an Indonesian state electricity distribution company — holds a 49% ownership stake in S2P. The borrowing terms of the loan are unknown. However, it is known that Bank of China contributed $1 billion (captured in Record ID#69234), China Development Bank contributed $98 million (captured in Record ID#61465), and Bank Rakyat Indonesia (a local bank) contributed $300 million to the syndicated loan. It is also known that the borrower was to use the proceeds of the loan to finance an EPC contract between PLN and China Chengda Engineering Co., Ltd., which was signed on June 5, 2015. The purpose of the project was to install a fourth unit (with 1000MW of power generation capacity) at the Jawa-8 Coal-Fired Power Plant (also known as the Cilacap Power Station). The plant is located in the villages of Karangkandri, Menganti and Slarang within Kesugihan subdistrict, Cilacap Regency, and Central Java province. China Chengda Engineering Co., Ltd. was the general EPC contract responsible for implementation. S2P and PLN signed a Power Purchase Agreement (PPA) on October 30, 2015 and S2P expected the power plant to begin commercial operations within 39 months of the loan signature date (i.e. December 19, 2019). A formal groundbreaking ceremony took place on October 12, 2016. However, construction did not begin until November 17, 2016. The power plant passed a 168-hour test run and it was put into commercial operation on November 9, 2019. The project was formally handed over to the Indonesian side on May 8, 2020, marking its official completion. Bank of China also provided an additional loan for Phase 1 of the Jawa-8 (Cilacap) Power Plant Project (captured in Record ID#34801) and CDB provided an additional loan for Phase 2 of the Jawa-8 (Cilacap) Power Plant Project (captured in Record ID#34748).

Staff comments

1. This project is also known as the Cilacap Power Station Phase 3 Project, Cilacap Power Station Expansion Phase III Project, Unit 4 of Jawa-8 Power Plant Construction Project, and the 1000MW Jawa-8 Power Plant Expansion Project. The Chinese project title is 印尼芝拉扎三期百万千瓦火电机组工程 or 印尼芝拉扎电厂三期扩建工程. The Indonesian project title is Proyek PLTU Cilacap Ekspansi 1x1.000 MW. 2. The CDB loan that supported this project is included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020. However, it incorrectly identified a $700 million loan that was contracted in 2013. 3. Some sources refer to Unit 4 as having power generation capacity of 945MW rather than 1000MW.