Chinese Government provides grant for 20MW solar power plant, 10MW battery, and 3MW diesel generator

Commitment Year2018Country of ActivityAfghanistanDirect Recipient Country of IncorporationAfghanistanSectorEnergyFlow TypeGrant

Status

Project lifecycle

Pipeline: Commitment

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2018

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of this project is to build a 20MW photovoltaic power station in Bamyan City, equipped with a 10MWh energy storage system and a 3MW diesel power generation system. More detailed location information can be found at: https://www.openstreetmap.org/node/830011080#map=13/34.7960/67.8718 the exact location could not be found.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Funding agencies

Government Agencies

  • Unspecified Chinese Government Institution

Receiving agencies

Government Agencies

  • Government of Afghanistan

Implementing agencies

Miscellaneous Agency Types

  • China Electronic Engineering Design Institute

State-owned companies

  • Da Afghanistan Breshna Sherkat
  • Guangzhou International Engineering Consulting Co., LTD

Loan description

Chinese Government provides grant for 20MW solar power plant, 10MW battery, and 3MW diesel generator

Narrative

Full Description

Project narrative

In 2018, the Chinese Government provided a grant to the Government of Afghanistan for the construction of a 20MW solar power plant, a 10 MW battery, and a 3 MW diesel generator in Bamyan Province. The power plant, upon completion, will reportedly serve 20,000 customers in Bamyan Province. The size of this grant is unknown and the current implementation status of this project is unknown. The construction site of the project is located in Bamyan, Afghanistan, with a planned installed capacity of 100MWp. The first phase has 20MWp, and the project aims to provide green and reliable power to different local consumers (residents, businesses, supply industries and institutions), reduce the fossil fuel-based power load of the main grid, and ensure continuous renewable energy for consumers. In the fall of 2019, China Electronic Engineering Design Institute Co., Ltd. won the bid for the “Afghanistan Photovoltaic Power Generation Consulting Project” of the National Agency for International Development Cooperation. On November 20, 2019, in Kabul, the feasibility of the China-aided photovoltaic power generation project in Afghanistan was signed. The project plans to build a 20MW photovoltaic power station in Bamyan City, equipped with a 10MWh energy storage system and a 3MW diesel power generation system. Guangzhou International Engineering Consulting Co., Ltd. is responsible for the evaluation and consulting task of the photovoltaic power generation feasibility study in Afghanistan. In mid-November 2019, the company sent professional and technical personnel to participate in the project feasibility study group in accordance with the relevant provisions in the field, went to Afghanistan for 11 days of fieldwork, and participated in all tasks of the inspection team throughout the entire process, including needs surveys, basic data collection, site surveys, and the formation of a summary of talks with the competent authorities of the recipient country on the preliminary plan of the project.

Staff comments

The Chinese project title is 巴米扬省光伏电站项目.