China Eximbank provides RMB 396.9 million government concessional loan for 61.23 km Agboville-Rubino-Céchi Road Asphalting Project (Linked to Record ID#71375)

Commitments (Constant USD, 2023)$62,501,681
Commitment Year2017Country of ActivityCote d'IvoireDirect Recipient Country of IncorporationCote d'IvoireSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Nov 14, 2017
Start (actual)
Sep 4, 2015
End (planned)
Apr 23, 2018
End (actual)
Jan 5, 2022
First repayment (originally scheduled)
Mar 13, 2025
Last repayment (originally scheduled)
Sep 9, 2037

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project involves the asphalting of a 61.23 km road from Agboville to Cechi via Rubino; the asphalting of a 5.5 km Ananguié ramp; the asphalting of the 3 km Rubino road; and the asphalting of the 3 km Céchi road. More detailed locational information can be found at https://www.openstreetmap.org/directions?engine=fossgis_osrm_car&route=5.931%2C-4.211%3B6.251%2C-4.422#map=11/6.0918/-4.3409

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Côte d'Ivoire (Ivory Coast)

Implementing agencies

Government Agencies

  • Cote d'Ivoire Road Management Agency (AGEROUTE)

State-owned companies

  • China Road & Bridge Corporation (CRBC)

Loan description

China Eximbank provides RMB 396.9 million government concessional loan for 61.23 km Agboville-Rubino-Céchi Road Asphalting Project

Grace period7.3333 yearsGrant element56.308%Interest rate (t₀)1.9999%Interest typeUnknownMaturity19.8333 years

Narrative

Full Description

Project narrative

On September 29, 2017, the Chinese Ambassador and the Foreign Minister of Cote d'Ivoire signed a preferential loan framework agreement for the 71.5 km Odiénné-Gbéléban Road Asphalting Project and the 61.23 km Agboville-Rubino-Céchi Road Asphalting Project. Then, on November 14, 2017, the Government of Cote d'Ivoire and China Eximbank signed an RMB 810 million (CFA 67,959,283,985) government concessional loan (GCL) agreement [GCL NO. (2017) 18 TOTAL NO. (623)] to support these two road projects. The GCL was ratified by the Ivorian Council of Ministers on December 6, 2017. The borrowing terms of the loan are unknown. According to the Government of Cote d'Ivoire’s Aid Management Platform (AMP), 51% of the loan proceeds (or approximately RMB 413.1 million or CFA 34.65 billion) were used to support the 71.5 km Odiénné-Gbéléban Road Asphalting Project (as captured via Record ID#71377) and 49% of the loan proceeds (or approximately RMB 396.9 million or CFA 33,210,000,000) were used to support the 61.23 km Agboville-Rubino-Céchi Road Asphalting Project (as captured via Record ID#71375). The borrower was expected to use the loan proceeds for the 61.23 km Agboville-Rubino-Céchi Road Asphalting Project to finance 92.5% of the cost of a CFA 35,902,766,613 commercial (EPC) contract between the Ivorian Government’s Ministry of Economic Infrastructure, AGEROUTE, and China Road and Bridge Corporation (CRBC). The Ivorian Government was responsible for directly financing 7.5% of the cost of the commercial contract (CFA 2,692,707,496). According to the Government of Côte d'Ivoire’s Aid Management Platform (AMP), China Eximbank made 6 loan disbursements (worth CFA 30,147,872,464.50) for the 61.23 km Agboville-Rubino-Céchi Road Asphalting Project between 2018 and 2021: a CFA 3,305,288,863 disbursement on May 31, 2018, a CFA 4,465,944,824 disbursement on December 31, 2018, a CFA 6,328,424,860 disbursement on June 30, 2019, a CFA 10,160,538,846.50 disbursement on December 31, 2019, a CFA 1,726,675,071 disbursement on December 31, 2020, and a CFA 4,161,000,000 disbursement on December 31, 2021. The project, which was originally expected to created 100 permanent jobs and 300 temporary jobs, involves the asphalting of a 61.23 km road from Agboville to Cechi via Rubino; the asphalting of a 5.5 km Ananguié ramp; the asphalting of the 3 km Rubino road; and the asphalting of the 3 km Céchi road. The ultimate purpose of the project is to facilitate economic activity between Agboville and Adzopé and the other towns in the center of Ivory Coast (Dimbokro, Yamoussoukro, Bouaké). The 61.23 km Agboville-Rubino-Céchi road is considered by a key link in the development of country’s eastern coast region because it will facilitate the delivery of agricultural products to the local markets of Agboville and Adzopé and other towns (Dimbokro, Yamoussoukro, Bouaké). The road runs parallel to a railway line and constitutes a second mode of transportation for people and goods in the area. CRBC was the EPC contractor responsible for project implementation. The project was formally launched on September 4, 2015. However, project implementation did not commence until April 23, 2016. The project was originally scheduled for completion in April 23, 2018. However, as of October 31, 2017, the project was running 13 months behind schedule. The project had achieved a 34.14% physical completion rate as of October 31, 2017. According to the AMP, by January 6, 2021, the Rubino-Cechi section of the 61.23 km road from Agboville to Cechi was ‘accepted’ by the local authorities; however, a toll station had still not been built. The project was officially opened to traffic on January 5, 2022.

Staff comments

1. The French project title is Projet de bitumage de la route Agboville-Rubino-Céchi. The Chinese project title is 建的科特迪瓦阿博维尔—希市沥青公路项目 or 阿博维尔—希市沥青公路项目 or 科特迪瓦阿博维尔—西市新建沥青道路项目. 2. The system identification number for this project in the Government of Côte d'Ivoire’s Aid Management Platform (AMP) is 1120071324779. The AMP project code is 78062000723. 3. Additional loan disbursement details are provided on slide 9 of https://www.dropbox.com/s/8wr42j2lui4u6cn/ROUTE%20Agboville-Rubino-C%C3%A9chi_AVANCEMENT%20AU%2031%20OCTOBRE%202017.pptx?dl=0 4. According to the World Bank's Debtor Reporting System (DRS), the weighted average grace period of all official sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 7.3333 years in 2017. AidData estimates the grace period of the Export-Import Bank of China loan that supported the 61.23 km Agboville-Rubino-Céchi Road Asphalting Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0 5. According to the World Bank's Debtor Reporting System (DRS), the weighted average maturity of all official sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 19.8333 years in 2017. AidData estimates the maturity of the Export-Import Bank of China loan that supported the 61.23 km Agboville-Rubino-Céchi Road Asphalting Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0 6. According to the World Bank's Debtor Reporting System (DRS), the weighted average interest rate of all official sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 1.9999% in 2017. AidData estimates the interest rate of the Export-Import Bank of China loan that supported the 61.23 km Agboville-Rubino-Céchi Road Asphalting Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0