Chinese Government provides RMB 900 million grant for the Government Complex and Parliamentary Complex Construction Project (Linked to Record ID#53786)

Commitments (Constant USD, 2023)$136,934,806
Commitment Year2018Country of ActivityTajikistanDirect Recipient Country of IncorporationTajikistanSectorGovernment And Civil SocietyFlow TypeGrant

Status

Project lifecycle

Implementation

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2018
Start (planned)
Mar 15, 2020
Start (actual)
Apr 13, 2020
End (planned)
Mar 15, 2023

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The parliament complex is being built in Dushanbe on Rudaki Avenue. The government complex is being built in downtown Dushanbe on Rudaki Avenue and Ismoili Somoni Avenue. The project is located on the east side of Somoni Square, right opposite the existing presidential palace on the west side of the Square. More detailed locational information can be found at: https://www.openstreetmap.org/way/171373569 and https://www.google.com/maps/place/%D0%9A%D1%83%D0%BC%D0%B8%D1%82%D0%B0%D0%B8+%D0%B4%D0%B0%D0%B2%D0%BB%D0%B0%D1%82%D0%B8%D0%B8+%D0%B8%D0%B4%D0%BE%D1%80%D0%B0%D0%B8+%D0%B7%D0%B0%D0%BC%D0%B8%D0%BD+%D0%B2%D0%B0+%D0%B3%D0%B5%D0%BE%D0%B4%D0%B5%D0%B7%D0%B8%D0%B8+%D2%B6%D1%83%D0%BC%D2%B3%D1%83%D1%80%D0%B8%D0%B8+%D0%A2%D0%BE%D2%B7%D0%B8%D0%BA%D0%B8%D1%81%D1%82%D0%BE%D0%BD/@38.5817273,68.7904268,18z/data=!4m13!1m7!3m6!1s0x38b5d3e08c240011:0xd8b8cd6538adf96f!2sPresidential+Palace,+Rudaki+Avenue,+Dushanbe,+Tajikistan!3b1!8m2!3d38.5831202!4d68.7877836!3m4!1s0x38b5d3e034f5995b:0xe571f3ece3a0544b!8m2!3d38.5814034!4d68.7898374 and https://www.openstreetmap.org/way/661943994#map=17/38.58575/68.78951 and https://www.openstreetmap.org/way/529811068#map=15/38.5919/68.7875.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Tajikistan

Implementing agencies

Private Sector

  • Yanjian Group Co., Ltd.

State-owned companies

  • Shenyang Engineering & Supervision Consulting Co., Ltd. (Shenyang Supervision)
  • The Beijing Architectural Design and Research Institute Co., Ltd.

Loan desecription

Chinese Government provides RMB 900 million grant for the Government Complex and Parliamentary Complex Construction Project (Linked to Record ID#53786)

Narrative

Full Description

Project narrative

On August 31, 2017, the Chinese Government agreed to provide an RMB 1.5 billion grant ($230 million USD) grant to the Government of Tajikistan for the Government Complex and Parliamentary Complex Construction Project (captured via Record ID#53786). Then, in 2018, the Chinese Government committed an additional RMB 900 million in grant funding for the same project (captured via Record ID#71727). The purpose of the project is to finance the construction of a new parliament and government complex that is 49.7 meters high and that occupies a total area of 42,874 square meters. The project involves the construction of a 15-story building and two 13-story buildings on 10.27 hectares of land. The parliament complex is to be built in Dushanbe on Rudaki Avenue, and the government complex is to be built in downtown Dushanbe on Rudaki Avenue and Ismoili Somoni Avenue. The designed service life of both buildings is 100 years and each building structure consists of a reinforced concrete frame with a seismic precautionary intensity of 9 degrees. The main building includes a 1500-seat conference hall for joint session, a conference hall of the upper house, a conference hall of the lower house, a round-table conference hall, working rooms for the speaker, the deputy speaker and other members working in the permanent offices of the parliament, and it also includes the presidential exclusive rooms, garages, equipment rooms, landscaping, office furniture, etc. Yanjian Group is the contractor responsible for construction. Beijing Architectural Design and Research Institute Co., Ltd and Shenyang Engineering Supervision and Consulting Co., Ltd are responsible for the management and supervision of the project. On October 13, 2018, President of Tajikistan Emomali Rahmon and Premier of the State Council of the People's Republic of China Li Keqiang participated in a formal groundbreaking ceremony for the project. Then, on June 15, 2019, Xi Jinping and President Rahmon attended a ceremony to unveil the construction models for the buildings after their talks in Dushanbe. Construction ultimately began on or around April 13, 2020. The project was originally scheduled to commence on March 15, 2020 and reach completion on March 15, 2023.

Staff comments

1. The Chinese project title is 塔吉克斯坦议会大楼项目. The Tajik project title is сохтмонӣ дар биноҳои Парлумон ва Ҳукумати Ҷумҳурии Тоҷикистон.