Chinese Government provides a RMB 113.2 million grant for the National Assembly Building Construction Project (Linked to Record ID#65064)

Commitments (Constant USD, 2023)$21,508,189
Commitment Year2010Country of ActivityTogoDirect Recipient Country of IncorporationTogoSectorGovernment And Civil SocietyFlow TypeGrant

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Mar 29, 2010
Start (actual)
Jul 20, 2016
End (planned)
Apr 30, 2018
End (actual)
Jun 14, 2018

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project involved the construction of a 22 meter-high building for the National Assembly (Parliament) in a new administrative district (Lomé-2) in the northern part of the city of Lomé. More detailed locational information can be found at https://www.openstreetmap.org/relation/12035597

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Togo

Implementing agencies

Private Sector

  • Jiangsu Nantong No.3 Construction Group Co., Ltd.

Loan desecription

Chinese Government provides a RMB 113.2 million grant for the National Assembly Building Construction Project (Linked to Record ID#65064)

Narrative

Full Description

Project narrative

On March 26 and March 29, 2010, the Chinese Ambassador to Togo, Yang Min, and the Togolese Minister of Cooperation, Development and Territorial Rehabilitation signed an exchange of letters related to China's assistance to the National Assembly Building Construction Project. Then, on March 6, 2014, both governments signed an exchange of letters regarding the National Assembly Building Construction Project (captured by this project) and the Ministerial Complex Construction Project (captured by Record ID#65064). China’s Ministry of Commerce (MOFCOM) was the source of grant funding for this project and it reportedly committed RMB 113,200,000 in total. The Government of Togo provided an additional CFA 5,224,018,000 francs to the cover the full cost of the CFA 16.6 billion franc project. This project involved the construction of a 22 meter-high building for the National Assembly (Parliament) in a new administrative district (Lomé-2) in the northern part of the city of Lomé. More specifically, it involved the construction of a building that covered an area of 10,781 square meters. The building featured 175 offices, a plenary room with a capacity of 266 seats, a 90-seat meeting room and a 50-seat meeting room, 10 parliamentary committee rooms, an infirmary, and a cafeteria. It also involved the construction of a 300-vehicle parking lot and the installation of public lighting, fire, water supply, drinking water, rainwater evacuation, and wastewater systems. 427 (mostly Togolese) jobs were created through the implementation of this project. Jiangsu Nantong No.3 Construction Group Co., Ltd. was the contractor responsible for the implementation of the project. Construction on the building began on July 20, 2016. Work on the building was planned to be completed by the end of April 2018. The project was 89.13% complete in March 2018. Work was completed in April 2018. The building was officially handed over to the Togolese authorities on June 14, 2018, in a ceremony attended by the President of Togo Faure Gnassingbé, the Prime Minister of Togo Komi Sélom Klassou, and the President of the National Assembly of Togo Dama Dramani.

Staff comments

The French project title is La construction du nouveau palais de l’Assemblée Nationale or Le nouveau siège du parlement togolais or La construction du nouveau Palais de l’Assemblée national. The Chinese project title is 多哥议会大厦项目. No source says that the funds from China came from MOFCOM; however, AidData has assumed so because grants are capitalized by the government’s fiscal revenue. Additionally, it is unclear which year the Chinese grant money was secured, as multiple letters of exchange were signed. AidData has elected to code "2010" as the commitment year, as that is the earliest known date of any legal commitment, and check the "Year uncertain" box.