Project ID: 72796

China provides 10 million RMB medical equipment donation for Parakou Army Instruction Hospital (linked to #34144, #72795)

Commitment amount

$ 1796792.7365801418

Adjusted commitment amount

$ 1796792.74

Constant 2021 USD

Summary

Funding agency [Type]

Unspecified Chinese Government Institution [Government Agency]

Recipient

Benin

Sector

Health (Code: 120)

Flow type

Grant

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

ODA-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2014-04-01

Geography

Description

The Chinese-funded Parakou Army Instruction Hospital was inaugurated on February 13, 2011, and started its clinical activities on October 4, 2011 after a phase 1 construction costing 6 billion CFAF (see Project #34144). In order to improve the functioning of the said hospital and to improve its equipment, the Chinese government had offered an additional 11.5 million yuan or 920 million CFA francs for the second phase in April 2013, which allowed the construction of the water tower, the canteen, housing for duty guards, etc (see Project #72795). The Parakou Military Instruction Hospital was then officially handed over on Thursday, April 3, 2014. After this second phase, the government decides to provide medical equipment in the form of a donation for an amount of 10 million yuan or 800 million CFA francs to the hospital in Parakou. This equipment will help improve the services of the said hospital for the benefit of the populations of Parakou and the surrounding area. Located in the Okédama district on the edge of the interstate road, it is a set of four groups of buildings on two levels arranged in a "U" and connected to each other. This set is made up of three blocks: an administrative block comprising the management and its components and an amphitheater with 256 seats; a medical-technical unit with many units: medicine, surgery, maternity, odontostomatology, emergencies, radiology services, biomedical analysis laboratory, a complex of three operating theaters, a research and fight center against malaria and a laundry room; a technical unit comprising a generator with a power of 550 KVA, a water tower with a capacity of 50,000 liters, a canteen with 100 places, a guardhouse building, a mortuary and an electrical technical room and incinerator.

Number of official sources

3

Number of total sources

4

Download the dataset

Details

Cofinanced

No

Implementing agencies [Type]

Benin Ministry of Health [Government Agency]

Government of Benin [Government Agency]