Project ID: 72805

CADFund pledges USD 1.5 billion loan for 2×350MW supercritical coal-fired power generating plant and coal handling terminal in Ekumfi District

Pledged amount

$ 1771206762.5377007

Adjusted pledged amount

$ 1771206762.5377007

Constant 2021 USD

Not recommended for aggregates

This project is not recommended for use in creating aggregated sums. See the documentation for more information about this criteria.

Summary

Funding agency [Type]

China Development Bank (CDB) [State-owned Policy Bank]

Recipient

Ghana

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

Vague (Official Finance) (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Pipeline: Pledge (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2016-01-01

Description

In 2016, China-Africa Development Fund (CADFund) agreed in principle to provide a USD 1.5 billion long-term loan facility for the construction of a 2×350MW supercritical coal-fired power generating plant and coal handling terminal in Ghana. It is unclear whether CADFund ever formally committed these funds or signed any additional financial documents for this project. The project site is located within of Ekumfi Aboano Area and is proposed to cover an estimated area of 139 hectares. The project would influence areas including Ekumfi Aboano community, Ekumfi Kontankure Settlement, Ekumfi Estibeedu community, and Ekumfi Otuam community within the Ekumfi District Assembly area. This project is to be undertaken by the Volta River Authority (VRA) and Shenzhen Energy Group Company Limited of China (SEC). Shandong Electric Power Engineering Consulting Institute and CCCC-FHDI Engineering Company have completed feasibility studies for the project. GRIDCo has also completed the preliminary grid impact study for the project. This project was originally expected to commence in April 2017. However, construction has not yet begun and it is unclear if CADFund’s loan pledge ever materialized into an official loan commitment.

Number of official sources

3

Number of total sources

8

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

China-Africa Development Fund (CADFund) [State-owned Fund]

Indirect receiving agencies [Type]

Government of Ghana [Government Agency]

Implementing agencies [Type]

Volta River Authority [State-owned Company]

Shenzhen Energy Group Company Ltd. [State-owned Company]

CCCC-FHDI Engineering Co., Ltd. [State-owned Company]

Shandong Electric Power Engineering Consulting Institute Corp., Ltd. (SDEPCI) [Private Sector]

Loan Details

Bilateral loan

Investment project loan