Skip to content

Overview

Chinese Government provides $10 million interest-free loan for TAZARA Operations and Maintenance Project (Linked to Record ID#73169)

Commitments (Constant USD, 2023)$18,765,161
Commitment Year2006Country of ActivityZambiaDirect Recipient Country of IncorporationZambiaSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Pipeline: Commitment

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jun 22, 2006
First repayment
Dec 30, 2015
Last repayment
Dec 27, 2025

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project supported the Tanzania–Zambia Railway (TAZARA), which is an 1860 km railway that stretches from Dar‑es‑Salaam to Kapiri Mposhi. The railway crosses Tanzania in a southwest direction, leaving the coastal strip and then entering largely uninhabited areas of the vast Selous Game Reserve. The line crosses the TAN-ZAM highway at Makambako and runs parallel to the highway toward Mbeya and the Zambian border, before entering Zambia, and linking with Zambia Railways at Kapiri Mposhi. From sea level, the railway climbs to 550 meters (1,800 feet) at Mlimba, and then reaches its highest point of 1,789.43 meters at Uyole in Mbeya before descending to 1,660 meters at Mwenzo, the highest point in Zambia, and settling to 1,274.63 meters at Kapiri Mposhi. More detailed locational information can be found at https://www.openstreetmap.org/relation/14060545#map=7/-14.738/29.548

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Zambia

Implementing agencies

Intergovernmental Organizations

  • Tanzania-Zambia Railway Authority (TAZARA)

Loan desecription

Chinese Government provides $10 million interest-free loan for TAZARA Operations and Maintenance Project

Grace period10 yearsGrant element75.0516%Interest rate (t₀)0%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

In 1967, the Chinese Government provided an RMB 494 million interest-free loan to the Government of Zambia for the construction of the 1860 km Tanzania–Zambia Railway (TAZARA), stretching from Dar‑es‑Salaam to Kapiri Mposhi. Since then, the Chinese Government has provided a series of grants and loans to support TAZARA by providing spare parts, fuel, technical assistance, passenger coaches, and locomotives. On June 22, 2006, the Chinese Government provided a $10 million interest-free loan to support the ongoing operations and maintenance of TAZARA.

Staff comments

1. Since the borrowing terms of the interest-free loan are unavailable, AidData has set the maturity to 20 years by default and grace period to 10 years by default, per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity of interest-free loans is 20 years, with a drawdown period of 5 years, grace period of 5 years, and repayment over 10 years. AidData treats the drawdown period as providing 5 years of additional grace. 2. This project is part of the 2006 TAZARA Protocol. Record ID#73169 is also part of the 2006 TAZARA Protocol.