Project ID: 73174

China Eximbank provides $534.5 million preferential buyer’s credit for Port Gentil-Omboue Road and Bridge Construction Project (Linked to Project ID#60747)

Commitment amount

$ 603028712.9646777

Adjusted commitment amount

$ 603028712.96

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Gabon

Sector

Transport and storage (Code: 210)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2013-09-09

Actual start

2014-03-20

Actual complete

2020-12-23

Geography

Description

On September 9, 2013, the Government of Gabon and China Eximbank signed a government concessional loan (GCL) agreement worth RMB 810 million (or approximately $121 million) for the Port Gentil-Omboue Road and Booué Bridge Construction Project. This loan carried the following borrowing terms: a 20 year maturity, a 7 year grace period, and a 2% interest rate. In 2013, the Government of Gabon and China Eximbank also signed a USD-denominated preferential buyer’s credit (PBC) agreement for the Port Gentil-Omboué Road and Ogooué River Booué Bridge Construction Project. The face value of the PBC was approximately 254.4 billion CFA francs, or approximately $534,582,600. The borrowing terms of the PBC are unknown. The proceeds from the GCL and the PBC were used to finance a $663 million EPC contract with China Road and Bridge Corporation (CRBC). Approximately 95% of the cost of this project was financed by China Eximbank while the remaining 5% was financed by the Government of Gabon itself. The GCL that supported this project is captured in Project ID#60747. The PBC that supported this project is captured in Project ID#73174. The project involved the construction of a 93.26 km two-way, two-lane highway from Port Gentil to Omboué (with an asphalt concrete surface, a subgrade width of 12 meters, and a subgrade width of 10 meters), the construction of three bridges (the 4707 meter Ogooué River Bridge, the 367 meter Booué Bridge, and the 4577 meter Nkomi Laguna Bridge) measuring 13 km in length, and the construction of 141 culverts. CRBC was the contractor responsible for project implementation. It received an order to commence construction on March 20, 2014. Then, a formal groundbreaking ceremony took place on July 3, 2014. The project was handed over on December 23, 2020. There are some indications that the China Eximbank loans for the Port Gentil-Omboue Road and Bridge Construction Project may have financially underperformed vis-a-vis the original expectations of the lender. In mid-2014, a decline in international oil prices generated sharp reductions in Gabon’s oil exports and fiscal revenues. The country’s rising fiscal deficit led to the accumulation of arrears to external creditors. By 2017, the stock of the Government of Gabon’s external arrears stood at $115 million, including arrears to China, Canada, Germany, Spain, France, Israel, and South Korea. All of these arrears were successfully cleared by 2020. However, the Government of Gabon accumulated $3 million of additional arrears to Chinese creditors in 2020. By the end of May 2021, ‘the stock of [the Government of] Gabon’s external arrears stood at CFAF 98.03 billion (US$182.1 million), including CFAF 23.8 billion (US$44.2 million) vis-à-vis multilaterals and CFAF 21.05 billion (US$39.1 million) vis-à-vis government agencies and private creditors insured with companies from Paris Club member countries and from China [ICBC and China Construction Bank] CFAF 1.3 billion (US$2.42 million). The Government's strategy for the clearance of existing external arrears consists of focusing primarily on multilateral debt, bilateral debt, insured commercial commitments and seeking agreements with other creditors prior to the IMF Board meeting. Accordingly, we will clear the arrears vis-à-vis the multilaterals. We will also clear bilateral and commercial-insured arrears as follows: (i) Austria CFAF 6.83 billion (US$12.69 million); (ii) France CFAF 11.9 billion (US$22.11 million); (iii) Israel CFAF 2.23 billion (US$4.13 million); and Spain CFAF 0.09 billion (US$0.17 million). Regarding the other commercial arrears vis-à-cis AFREXIMBANK (CFAF 7.52 billion or US$13.97 million, and commercial non-insured vis-à-vis France CFAF 0.7 billion (US$1.24 million), Austria CFAF 8.71 billion (US$16.18 million), and Morocco CFAF 1.01 billion (US$1.87 million), we contacted these creditors individually to obtain from them the non-objection agreement. The same communication was made with China to which our bilateral payment arrears are about CFAF 34.01 billion (US$63.17 million).’ Then, in 2022, the IMF reported that the Government of Gabon’s external arrears to Chinese creditors stood at $23.9 million as of December 2021 and $1 million in June 2022.

Additional details

1. This project is also known as the Port Gentil-Omboué Road and Ogooué River Booué Bridge Construction Project, the PO Project, and the Libreville-Port-Gentil Road Project. The French project title is Port-Gentil-Omboué et du Pont sur l’Ogooué à Booué or the Route POG Omboué. The Chinese project title is 加蓬 让蒂尔港-翁布韦段公路 or 让蒂尔港-翁布埃沿海路及博韦大桥项目. 2. In the database of Chinese loan commitments that SAIS-CARI released in July 2020, it only identifies a single (concessional) loan for this project worth $134 million. However, the Government of Gabon, the Chinese Government and CRBC all report that China Eximbank covered approximately 95% of this $663 million project with a government concessional loan and a preferential buyer’s credit. Therefore, AidData records both of these loans. 3. Some sources indicate that this project also supported the construction of a 243 km road from Omboué to Yombi. However, these appear to be references to a second phase of the project. The extension from Omboué to Yombi will eventually allow this road to link up with the Nationale No. 1, Gabon’s main road from Libreville to the south of the country (Lambaréné, Ndendé) and Congo-Brazzaville.

Number of official sources

11

Number of total sources

14

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Gabon [Government Agency]

Implementing agencies [Type]

China Road & Bridge Corporation (CRBC) [State-owned Company]

Loan Details

Bilateral loan

Export buyer's credit

Investment project loan

Preferential Buyer's Credit