Chinese Government provides RMB 362.1 million interest-free loan for Lot 2 of Akassato-Bohicon Road Rehabilitation Project (Linked to Record ID#30834, #58807, and #58722)

Commitments (Constant USD, 2023)$60,891,216
Commitment Year2013Country of ActivityBeninDirect Recipient Country of IncorporationBeninSectorTransport And StorageFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2013
Start (actual)
Jan 16, 2014
End (actual)
Sep 28, 2016
First repayment
Dec 30, 2022
Last repayment
Dec 27, 2032

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project involved the rehabilitation of a 19.26 km section from Glo-Djigbé to Allada (PK 26 + 500 to PK 45 + 760). More detailed locational information can be found at https://www.openstreetmap.org/directions?engine=fossgis_osrm_car&route=6.6726%2C2.1239%3B6.5593%2C2.3033#map=13/6.6387/2.2039.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

Government Agencies

  • China Ministry of Commerce

Receiving agencies

Government Agencies

  • Government of Benin

Implementing agencies

State-owned companies

  • China Chongqing International Construction Corporation (CICO)

Loan desecription

Chinese Government provides RMB 362.1 million interest-free loan for Lot 2 of Akassato-Bohicon Road Rehabilitation Project

Grace period10 yearsGrant element75.0516%Interest rate (t₀)0%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On 5 October, 2012, the Chinese Government and the Government of Benin signed a CFA 129 billion preferential loan framework agreement for the Akassato-Bohicon Road Rehabilitation Project. The terms and conditions specified in the framework agreement were a 20-year maturity and a 7-year grace period; however, the Chinese Government subsequently approved three separate tranche loans for Lot 1, Lot 2, and Lot 3 of the Akassato-Bohicon Road Rehabilitation Project, instead. In 2013, China’s Ministry of Commerce and the Government of Benin signed an RMB 141 million interest-free loan agreement for Lot 1 and an RMB 362.1 million interest-free loan agreement for Lot 2. On 23 August, 2013, China Eximbank and the Government of Benin signed an RMB 800 million government concessional loan (GCL) loan agreement [CHINA EXIMBANK GCL 2013 NO. (2013) NO. (37) TOTAL NO. (482) NO. (1420303052013111728)] for Lot 3, which carried the following terms: 20-year maturity, 7-year grace period, 1% interest rate, 0.25% commitment fee, and a 0.25% management fee. The proceeds of the MOFCOM loan for Lot 1 were to be used by the borrower to finance a commercial contract with China Geo-Engineering Corporation (CGC). The proceeds of the MOFCOM loan for Lot 2 were to be used by the borrower to finance a commercial contract with Chongqing International Construction Corporation (CICO) worth 30 billion CFAF. The proceeds of the GCL were to be used by the borrower to finance a commercial contract (ID#74/MTPT/DNCMP/SP) between Benin’s Ministry of Public Works and Transportation and China Xinxing Group General Corporation, which was signed on 5 March, 2013. The Akassato-Bohicon Road Rehabilitation Project involved the rehabilitation of a 103.8 km road segment along the No. 2 Interstate Highway from Akassato to Bohicon. The project was divided into three lots. Lot 1 involved the rehabilitation of a 12.3 km section from Akassato to Glo-Djigbé (PK 14 + 200 to PK 26 + 500). Lot 2 involved the rehabilitation of a 19.26 km section from Glo-Djigbé to Allada (PK 26 + 500 to PK 45 + 760). Lot 3 involved the rehabilitation of a 73 km section from Allada to Bohicon (PK45 + 760 to PK1 17 + 865). A formal groundbreaking ceremony for Lot 1 took place on January 5, 2013; however, Lot 1 construction did not commence until April 30, 2013. Lot 1 was officially handed over to the Government of Benin on August 12, 2015. A formal groundbreaking ceremony for Lots 2 and 3 was held on 16 January, 2014. Lot 2 was officially handed over to the Government of Benin on 28 September, 2016. Lot 3 was completed in March 2016. Record ID#30834 captures the CFA 129 billion preferential loan framework agreement. Record ID#58722 captures the RMB 141 million interest-free loan from MOFCOM for Lot 1. This project captures the RMB 362.1 million interest-free loan from MOFCOM for Lot 2. Record ID#58807 captures the RMB 800 million interest-free loan from China Eximbank for Lot 3.

Staff comments

1. The French project title is Projet de Réhabilitation de la route Akassato-Bohicon. The Chinese project title is 阿卡萨多-博依贡公路 or 贝宁阿卡萨多—博伊贡公路项目 or 阿卡萨托—博希孔公路修复工程. 2. According to the Parliament of Benin, the Chinese Government provided RMB 503.1 million of loans for Lot 1 and Lot 2. The face value of the loan that supported Lot 1 was RMB 141 million, so AidData assumes that the face value of the loan that supported Lot 2 was RMB 362.1 million. 3. Since loan terms for the interest-free loan are unavailable, AidData has set maturity period to 20 years by default and grace period to 10 years by default per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity period of interest-free loans is 20 years, with a drawdown period of 5 years, grace period of 5 years, and repayment over 10 years. AidData treats the drawdown period as providing 5 years of additional grace.