Project ID: 85268

China Eximbank provides RMB 3.59 billion buyer’s credit loan for 913 MW Lamard Combined Cycle Power Plant Project (Linked to Project ID#85267)

Commitment amount

$ 612422463.7756274

Adjusted commitment amount

$ 612422463.78

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Iran

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Central government-guaranteed debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Implementation (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2017-01-01

Actual start

2022-01-01

Geography

Description

In 2017, China Eximbank and Iran’s Bank of Industry and Mine — an Iranian state-owned bank— signed an RMB 3,591,317,330 ($602 million) buyer’s credit loan agreement for the 913MW Lamard Combined Cycle Power Plant Project. Iran’s Ministry of Economy issued a sovereign guarantee in support of the loan in February 2017. The purpose of the project is to construct a 913MW combined cycle power plant in the Lamerd Special Economic Zone within the southern province of Fars and supply electricity to the aluminum smelter run by South Aluminum Corporation (SALCO or شرکت آلومینیوم جنوب). The project also involves the construction of an 11 km electricity transmission line, a 35 kilometer electricity transmission line, a 230kV electricity substation, and a 400kV electricity substation to evacuate power from the power plant to the national grid. The plant itself is located at the 8th km on Lamerd-Khonj road with the city of Lamerd. The locational coordinates of the plant are 27.335372, 53.157570. The construction of the plant is being implemented on a Build-Own-Operate (BOO) basis and financed with 85% debt and 15% equity. Ghadir Electricity & Energy Investment Co. and China National Electric Engineering Co (CNEEC) are the contractors responsible for implementation. By June 2019, the power plant was apparently under construction, including preliminary civil works. Then, in 2020, the first phase of the aluminum smelter launched (with two additional phases slated for 2025). As of August 2022, the project had achieved a 40% completion rate and the construction of the 11 km electricity transmission line and the electricity substations had reached completion. The Chinese Government has also provided a loan for the construction of the aluminum smelter run by South Aluminum Corporation (captured in Project ID#85267).

Additional details

1. This project is also known as 911MW Lamerd Combined Cycle Power Plant Project and the Ghadir Lamerd Power Station Project. The Persian project title is نیروگاه سیکل ترکیبی ۹۱۳ مگاواتی غدیر انرژی لامرد or یروگاه سیکل ترکیبی لامرد. 2. The loan commitment year is uncertain. For the time being, AidData treats 2017 as the loan commitment year because it is the year when Iran’s Ministry of Economy disclosed the existence of the loan and issued a sovereign guarantee for it. 3. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020.

Number of official sources

13

Number of total sources

24

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Iran Bank of Industry and Mines [State-owned Bank]

Implementing agencies [Type]

China National Electric Engineering Co., Ltd. (CNEEC) [State-owned Company]

Guarantee provider [Type]

Government of Iran [Government Agency]

Loan Details

Bilateral loan

Export buyer's credit

Inter-bank loan