China Eximbank provides RMB 3.59 billion buyer’s credit loan for 913 MW Lamard Combined Cycle Power Plant Project (Linked to Record ID#85267)

Commitments (Constant USD, 2023)$565,541,370
Commitment Year2017Country of ActivityIranDirect Recipient Country of IncorporationIranSectorEnergyFlow TypeLoan

Status

Project lifecycle

Implementation

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2017
Start (actual)
Jan 1, 2022

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project is to construct a 913MW combined cycle power plant in the Lamerd Special Economic Zone within the southern province of Fars and supply electricity to the aluminum smelter run by South Aluminum Corporation (SALCO or شرکت آلومینیوم جنوب). The project also involves the construction of electricity transmission lines and substations to evacuate power from the plant. The plant itself is located at the 8th km on Lamerd-Khonj road with the city of Lamerd. The locational coordinates of the plant are 27.335372, 53.157570. More detailed locational information can be found at https://www.openstreetmap.org/way/310215387 and https://goo.gl/maps/Pkb4oKWV9X1Dj7Vj7.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

State-owned Banks

  • Iran Bank of Industry and Mines

Implementing agencies

State-owned companies

  • China National Electric Engineering Co., Ltd. (CNEEC)

Guarantors

Government Agencies

  • Government of Iran

Loan desecription

China Eximbank provides RMB 3.59 billion buyer’s credit loan for 913 MW Lamard Combined Cycle Power Plant Project

Interest typeUnknown

Narrative

Full Description

Project narrative

In 2017, China Eximbank and Iran’s Bank of Industry and Mine — an Iranian state-owned bank— signed an RMB 3,591,317,330 ($602 million) buyer’s credit loan agreement for the 913MW Lamard Combined Cycle Power Plant Project. Iran’s Ministry of Economy issued a sovereign guarantee in support of the loan in February 2017. The purpose of the project is to construct a 913MW combined cycle power plant in the Lamerd Special Economic Zone within the southern province of Fars and supply electricity to the aluminum smelter run by South Aluminum Corporation (SALCO or شرکت آلومینیوم جنوب). The project also involves the construction of an 11 km electricity transmission line, a 35 kilometer electricity transmission line, a 230kV electricity substation, and a 400kV electricity substation to evacuate power from the power plant to the national grid. The plant itself is located at the 8th km on Lamerd-Khonj road with the city of Lamerd. The locational coordinates of the plant are 27.335372, 53.157570. The construction of the plant is being implemented on a Build-Own-Operate (BOO) basis and financed with 85% debt and 15% equity. Ghadir Electricity & Energy Investment Co. and China National Electric Engineering Co (CNEEC) are the contractors responsible for implementation. By June 2019, the power plant was apparently under construction, including preliminary civil works. Then, in 2020, the first phase of the aluminum smelter launched (with two additional phases slated for 2025). As of August 2022, the project had achieved a 40% completion rate and the construction of the 11 km electricity transmission line and the electricity substations had reached completion. The Chinese Government has also provided a loan for the construction of the aluminum smelter run by South Aluminum Corporation (captured in Record ID#85267).

Staff comments

1. This project is also known as 911MW Lamerd Combined Cycle Power Plant Project and the Ghadir Lamerd Power Station Project. The Persian project title is نیروگاه سیکل ترکیبی ۹۱۳ مگاواتی غدیر انرژی لامرد or یروگاه سیکل ترکیبی لامرد. 2. The loan commitment year is uncertain. For the time being, AidData treats 2017 as the loan commitment year because it is the year when Iran’s Ministry of Economy disclosed the existence of the loan and issued a sovereign guarantee for it. 3. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020.