[Sino-Congolese Programme] China Eximbank provides $5.33 million loan for construction of 5km ramp connecting the Kalemie stadium to Lumumba Boulevard (Linked to Project ID#450, #59220)

Commitment amount

$ 5985117.440824382

Adjusted commitment amount

$ 5985117.44

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Congo (DRC)

Sector

Transport and storage (Code: 210)

Flow type

Loan

Level of public liability

Central government-guaranteed debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Implementation (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2015-08-17

Actual start

2020-09-03

Geography

Description

In 2008, China Eximbank issued a $3 billion line of credit to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (See Project ID#450). All borrowings through this line of credit (framework agreement) are repaid with revenues from mining projects managed by Sicomines SARL. Each subsidiary loan issued through the line of credit carries a maturity of 25 years, a grace period of 10 years, and an interest rate of 6-month LIBOR plus a 1% margin (or 3.839% at the time of the agreement). The infrastructure projects that are supported by this line of credit are collectively referred to as the ‘Sino-Congolese Programme”’ The Government of Democratic Republic of Congo issued a sovereign guarantee for all infrastructure loans approved through the ‘Sino-Congolese Programme’ line of credit. One of the subsidiary loans issued as part of the 'Sino-Congolese Programme' was a $5,333,019.45 loan for the construction of a 5 km ramp connecting the Kalemie stadium to Lumumba Boulevard. As of 2020, the loan achieved a disbursement rate of 66% ($3,535,947.76 out of $5,333,019.45). CREC 9 — a subsidiary of China Railway Engineering Corporation (CREC) — is the contractor responsible for project implementation. It was awarded a $5,333,019.45 contract (ID#ACGT/DG/07/2019). The project official began construction on September 3, 2020. Asphalting for the ramp began January 28, 2021.

Additional details

1. The French project name is Construction de la bretelle reliant le stade de Kalemie au boulevard Lumumba. 2 According to the 2018 ACGT Annual Report, funding was still pending the approval by the Board of Directors of Sicomines SARL in 2018 after a request was made to reallocate funds from the Kalemie airport terminal project (see Project ID#59220) to this ramp construction project.

Number of official sources

6

Number of total sources

7

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Sino–Congolais des Mines (Sicomines SARL) [Joint Venture/Special Purpose Vehicle]

Implementing agencies [Type]

CREC 9 [State-owned Company]

Guarantee provider [Type]

Government of Democratic Republic of Congo [Government Agency]

Collateral provider [Type]

Sino–Congolais des Mines (Sicomines SARL) [Joint Venture/Special Purpose Vehicle]

Collateral

Profits from the investment by SICOMINES SARL in the copper and cobalt mine at Kolwezi

Loan Details

Maturity

25 years

Interest rate

3.839%

Grace period

10 years

Grant element (OECD Grant-Equiv)

42.9733%

Bilateral loan

Investment project loan