YMEC provides $160 million supplier credit for 280MW Paungluang Hydropower Plant Construction Project (Linked to Record ID#63813)

Commitments (Constant USD, 2023)$379,271,914
Commitment Year2000Country of ActivityMyanmarDirect Recipient Country of IncorporationChina (People's Republic of)SectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Sep 18, 2000
Start (actual)
Oct 1, 1998
End (actual)
Mar 25, 2005
Last repayment
Sep 16, 2010

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to construct a 280MW hydroelectric power plant — with four, 70MW power generation units (Unit 1, Unit 2, Unit 3, and Unit 4) — on the Paungluang River in Pyinmana within Zeyarthiri Township (exact locational coordinates: 19.786444, 96.335833). The project site is located about 20 km east of Nay Pyi Taw and has the highest dam in the sub-basin (131 meters). It includes an underground power plant close to the toe of the spillway. The reservoir inundates 15 km2 and stores 678 hm3. It is a multipurpose dam, which primary purpose is hydroelectric power generation, but also serves irrigated agriculture by providing water to an irrigation weir about 14 km downstream. A 13 km double circuit 230 kV connects the power plant to the Pyinmana substation. More detailed locational information can be found at https://www.openstreetmap.org/way/306819854 and https://www.openstreetmap.org/way/405416534.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% Chinese ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Private Sector

  • Yunnan Machinery and Equipment Import and Export Co., Ltd. (YMIEC)

State-owned companies

  • Myanmar Electric Power Enterprise

Implementing agencies

Private Sector

  • Yunnan Machinery and Equipment Import and Export Co., Ltd. (YMIEC)

State-owned companies

  • Sinohydro Corporation Limited

Insurance providers

State-owned companies

  • China Export & Credit Insurance Corporation (Sinosure)

Loan desecription

YMEC provides $160 million supplier credit for 280MW Paungluang Hydropower Plant Construction Project

Grant element25.3486%Interest rate (t₀)2.75%Interest typeFixed Interest RateMaturity10 years

Narrative

Full Description

Project narrative

In October 1998, Yunnan Machinery and Equipment Import and Export Corporation (YMEC) signed the first contract for the Paunglaung Hydroelectric Power Project, which called for YMEC to provide the complete set of machinery and equipment, design underground factory and direct work implementation. The first contract was worth 160 million USD, and was to be financed by an export credit with a 2.75% interest rate, and payable over 10 years. The second contract was signed in November 1998 between YMEC and Myanmar Electric Power Enterprise (MEPE) stated that YMEC was to provide machinery and equipment and spare parts for construction of the underground factory. The second contract was worth 10 million USD and was to be supported by an export seller's credit, with a maturity of 7 years, grace period of 2 years, and interest rate of 5%. Based on a news release from China’s Ministry of Commerce, the project was approved by the State Council of China in August 1998. On September 18, 2000, China Eximbank and Yunnan Machinery and Equipment Import and Export Corporation (YMEC) signed an RMB 1 billion export seller's credit agreement for the 280MW Paungluang Hydropower Plant Construction Project. YMEC, in turn, used the proceeds from the export seller's credit to finance two separate supplier credit agreements that it previously signed with Myanmar Electric Power Enterprise (MEPE): a $160 million supplier credit agreement in October 1998 that carried a 2.75% interest rate and a 10 year maturity (captured in this project), and a $10 million supplier credit agreement in August 1998 that carried a maturity of 7 years, grace period of 2 years, and an interest rate of 5% (captured in Record ID#63813). YMEC also received credit insurance from Sinosure. The purpose of the project was to construct a 280MW hydroelectric power plant — with four, 70MW power generation units (Unit 1, Unit 2, Unit 3, and Unit 4) — on the Paungluang River in Pyinmana within Zeyarthiri Township (exact locational coordinates: 19.786444, 96.335833). The project site is located about 20 km east of Nay Pyi Taw and has the highest dam in the sub-basin (131 meters). It includes an underground power plant close to the toe of the spillway. The reservoir inundates 15 km2 and stores 678 hm3. It is a multipurpose dam, which primary purpose is hydroelectric power generation, but also serves irrigated agriculture by providing water to an irrigation weir about 14 km downstream. A 13 km double circuit 230 kV connects the power plant to the Pyinmana substation. Yunnan Machinery and Equipment Import and Export Corporation (YMEC) and Sinohydro Corporation Ltd. were the contractors responsible for implementation, and the project is owned by the Ministry of Electricity and Energy of Myanmar. The project commenced in October 1998 and it was completed on March 25, 2005.

Staff comments

1. This project is also known as the 280MW Paungluang Hydropower Plant Project, the Lower Paunglaung Hydropower Project, and the Lower Paung Laung HPP Project. The Chinese project title is 的缅甸邦朗电站项目 or 邦朗(下游)水电站 or 邦朗水电站. The Burmese project title is အောက်ပေါင်းလောင်း တာတမံ. 2. Myanmar Electric Power Enterprise (MEPE) is a state-owned power company in Myanmar. 3. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020.