Narrative
Full Description
Project narrative
In 2015, Acleda Bank entered into a $18,000,000 loan agreement for a line of credit with Industrial and Commercial Bank of China Limited - Phnom Penh Branch. The full $18 million was drawn down (disbursed) on September 1, 2015. The maturity date is August 31, 2018, which effectively represents a 3 year maturity. The loan was repaid in full on its maturity date, and its purpose was not specified.
Staff comments
1. AidData has inferred the commitment year to be 2015, as this loan is not in the 2014 Annual Report produced by Acleda Bank.