Narrative
Full Description
Project narrative
In 2016, Acleda Bank entered into a $21,000,000 loan agreement for a line of credit with Industrial and Commercial Bank of China Limited - Phnom Penh Branch. The full $21 million USD was drawn down on September 19, 2016. The maturity date is September 19, 2019, which gives a 3 year maturity. The loan was to be repaid in full on its maturity date, and its purpose was not specified.
Staff comments
AidData has inferred the commitment year to be 2016, as this loan is not in the 2015 Annual Report produced by Acleda Bank.