Narrative
Full Description
Project narrative
In 2016, Acleda Bank entered into a $15,000,000 loan agreement for a line of credit with Industrial and Commercial Bank of China Limited - Phnom Penh Branch. $10 million USD was drawn down on November 1, 2016, and the remaining $5 million USD was drawn down on February 27, 2017. The maturity date is November 1, 2019 for the first draw-down and February 27, 2020 for the second draw-down, giving a 3 year maturity period. The loan was repaid in full on its maturity date, and its purpose was not specified.
Staff comments
AidData has inferred the commitment year to be 2016, as this loan is not in the 2015 Annual Report produced by Acleda Bank.