China Eximbank provides RMB 1.973 billion government concessional loan for 12-City Water Supply Project

Commitments (Constant USD, 2023)$298,341,846
Commitment Year2019Country of ActivityCote d'IvoireDirect Recipient Country of IncorporationCote d'IvoireSectorWater Supply And SanitationFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Nov 13, 2019
Start (actual)
Sep 25, 2020
End (planned)
Sep 15, 2023
End (actual)
Aug 2, 2024
First repayment
Dec 5, 2025
Last repayment
Sep 21, 2036

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project is to construct water infrastructure — including the construction of river water intake stations, water treatment plants, surface storage tanks, high-level water towers, and water pipe networks as well as refurbishment of existing water infrastructure — in 12 towns and cities, including Bouaflé, Daloa, Divo, Grand-Lahou, Katiola, Mankono, Boundiali, Odienné, Séguéla, Touba, Sassandra, and Tanda. More detailed locational information can be found at: https://www.openstreetmap.org/node/4387322934, https://www.openstreetmap.org/node/1597912529, https://www.openstreetmap.org/node/443389991, https://www.openstreetmap.org/node/359133934, https://www.openstreetmap.org/node/443378249#map=13/8.1404/-5.1022, https://www.openstreetmap.org/node/2735819665, https://www.openstreetmap.org/node/2522426405, https://www.openstreetmap.org/node/319225802, https://www.openstreetmap.org/node/2725995822, https://www.openstreetmap.org/node/319225798, https://www.openstreetmap.org/node/1595489017, https://www.openstreetmap.org/node/843418409

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Côte d'Ivoire (Ivory Coast)

Implementing agencies

State-owned companies

  • China Geo-Engineering Corporation (CGC)
  • China Power Construction Group Kunming Survey and Design Institute Co., Ltd.

Loan desecription

China Eximbank provides RMB 1.973 billion government concessional loan for 12-City Water Supply Project

Grace period6.0659 yearsGrant element50.4764%Interest rate (t₀)2.1622%Interest typeFixed Interest RateMaturity16.8699 years

Narrative

Full Description

Project narrative

On October 17, 2019, the Chinese Government and the Government of Côte d'Ivoire signed a preferential loan framework agreement for the 12-City Water Supply Project. The agreement was signed by China’s Ambassador to Côte d'Ivoire Wan Li and Côte d'Ivoire’s Foreign Minister Marcel Amon-Tanoh. Then, on November 13, 2019, China Eximbank and the Government of Côte d'Ivoire signed a government concessional loan (GCL) agreement [CHINA EXIMBANK GCL No. (2019) 13 TOTAL NO. (684)] worth RMB 1,973,711,522 billion RMB (CFA 166,363,485,142) for the 12-City Water Supply Project. The GCL agreement was ratified by the Ivorian Council of Ministers on January 8, 2020. The borrowing terms of the loan are unknown. However, it is known that the proceeds of the loan are to be used by the borrower to finance an RMB 2.06 billion commercial contract between the Government of Côte d'Ivoire and China Geo-Engineering Corporation (中国地质工程集团公司). As of December 31, 2023, the loan had achieved a 77.5% disbursement rate (CFA 129,061,580,042.10 out of CFA 166,363,485,142). 14 loan disbursements were made between 2020 and 2023: a CFA 51,075,240,000 disbursement on August 31, 2020 a CFA 3,143,000,000 disbursement on March 31, 2021, a CFA 15,226,191,363.70 disbursement on December 31, 2021, a CFA 5,438,081,971 disbursement on February 28, 2022, a CFA 4,949,064,961 disbursement on March 31, 2022, a CFA 2,850,517,854 disbursement on April 30, 2022, a CFA 5,705,350,000 disbursement on May 31, 2022, a CFA 8,810,830,408 disbursement on June 30, 2022, a CFA 4,399,881,712.40 disbursement on December 31, 2022, a CFA 6,750,283,036 disbursement on January 31, 2023, a CFA 3,009,550,736 disbursement on February 28, 2023, a CFA 4,439,890,000 disbursement on May 31, 2023, a CFA 7,389,858,000 disbursement on June 30, 2023, and a CFA 5,873,840,000 disbursement on October 31, 2023. The purpose of the project is to construct water infrastructure — including the construction of river water intake stations, water treatment plants, surface storage tanks, high-level water towers, and water pipe networks as well as refurbishment of existing water infrastructure — in 12 towns and cities, including Bouaflé, Daloa, Divo, Grand-Lahou, Katiola, Mankono, Boundiali, Odienné, Séguéla, Touba, Sassandra, and Tanda. Upon completion, the project is expected to supply drinking water to 1.537 million inhabitants by 2020 and 2.237 million inhabitants by 2033. China Power Construction Group Kunming Survey and Design Institute Co., Ltd., is responsible for project design and China Geo-Engineering Corporation (中国地质工程集团公司) is responsible for project implementation. A groundbreaking ceremony took place on September 15, 2020 and the originally expected duration of the construction period was 36 months (September 15, 2023). The project achieved the provisional acceptance stage on September 26, 2023. A formal project completion ceremony took place on August 2, 2024.

Staff comments

1. This project is also known as the 12 Regions Urban Water Supply Project and the 12-City Drinking Water Supply Project. The Chinese project title is 12城市供水项目 or 迪沃市供水项目. The French project title is Projet de Renforcement de l’Alimentation en Eau Potable de 12 Villes or Projet de renforcement de l’alimentation en eau potable des villes de Bouaflé, Boundiali, Daloa, Divo, Grand-Lahou, Katiola, Mankono, Odienné, Sassandra, Séguéla, Tanda, Touba or Lancement des travaux du projet d’adduction d’ eau potable des 12 villes. 2. The AMP system identification number for the China Eximbank loan is 1120071334022. 3. The AMP identifies the loan commitment date as October 30, 2019 rather than November 13, 2019. This issue merits further investigation. 4. According to the World Bank's Debtor Reporting System (DRS), the weighted average grace period of all official sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 6.0659 years in 2019. AidData estimates the grace period of the Export-Import Bank of China loan that supported the 12-City Water Supply Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0 5. According to the World Bank's Debtor Reporting System (DRS), the weighted average maturity of all official sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 16.8699 years in 2019. AidData estimates the maturity of the Export-Import Bank of China loan that supported the 12-City Water Supply Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0 6. According to the World Bank's Debtor Reporting System (DRS), the weighted average interest rate of all official sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 2.1622% in 2019. AidData estimates the interest rate of the Export-Import Bank of China loan that supported the 12-City Water Supply Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0