China Eximbank provides $49.12 million preferential buyer’s credit for Erdenet Thermal Power Plant 35 MW Generator Installation Project (Linked to Project ID#49148)
Commitment amount
$ 53533419.6158006
Adjusted commitment amount
$ 53533419.62
Constant 2021 USD
Summary
Funding agency [Type]
Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]
Recipient
Mongolia
Sector
Energy (Code: 230)
Flow type
Loan
Level of public liability
Central government debt
Infrastructure
Yes
Category
Project lifecycle
Geography
Description
On November 10, 2015, China Eximbank and the Government of Mongolia signed a general loan agreement regarding the utilization of a $1 billion preferential buyer's credit (PBC) loan for various projects (captured via Umbrella Project ID#49148). Under the terms of the general loan agreement, all subsidiary (individual) loan agreements for specific projects carry identical borrowing terms: a 20-year maturity, a 7-year grace period, a 2% interest rate, a 0% default (penalty) interest rate, a 0% management fee, and a 0.25% commitment fee. Then, on April 9, 2018, China Eximbank and the Government of Mongolia signed a subsidiary PBC agreement [CHINA EXIMBANK PBC 2018 (13) TOTAL NO. (470)] worth $49,120,000 for the 35MW Erdenet Thermal Power Plant Expansion Project. The proceeds of the PBC were to be used by the borrower to finance 95% of the cost of a $51.8 million commercial (EPC) contract between Mongolia’s Ministry of Energy, China Energy Engineering Group Hunan Power Construction Co., Ltd, and Hunan Industrial Equipment Installation Co., Limited, which was signed on January 17, 2017. The remaining 5% of the commercial contract cost was to be directly funded by the Government of Mongolia. The purpose of the project was to expand the Erdenet Thermal Power Plant (Эрдэнэт ДЦС or Эрдэнэтская ТЭЦ or Эрдэнэтийн дулааны цахилгаан станцын) by installing a 35MW turbine generator with a CC-50 engine, refurbishing chemical and water purification facilities, constructing a water-cooling tower, and building a 110 kV overhead transmission line (measuring 3 km in length) and substation. This power plant is located in Erdenet, capital of Mongolia's northern province of Orkhon. Upon completion, this project was expected to increase the power plant's electricity production two-fold (from 36MW to 71MW). A groundbreaking ceremony took place on March 22, 2019 and construction originally expected to conclude by the end of 2019. However, a project completion and power plant commissioning ceremony did not take place until September 3, 2021.
Additional details
1. This project is also known as the Erdenet Thermal Power Plant 35 MW Generator Installation Project. The Mongolian project title is “Эрдэнэтийн дулааны цахилгаан станцын өргөтгөл” төсөл or Эрдэнэтийн дулааны цахилгаан станцын шинэчлэл төсөл or Эрдэнэтийн дулааны цахилгаан станцын шинэчлэлтийн төсөл. 2. The China Eximbank loan for this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020. 3. Hunan Industrial Equipment Installation Company previously conducted an expansion of Thermal Power Plant No. 3 in Ulaanbaatar. 4. The PBC (loan) agreement can be accessed in its entirety via https://www.dropbox.com/s/a9zqkgbb1qnho1y/Mongolia%202018%20China%20Eximbank%20Loan%20for%20Erdenet%20Thermal%20Power%20Plant%20Modernization%20Project.pdf?dl=0.
Number of official sources
17
Number of total sources
35
Details
Cofinanced
No
Direct receiving agencies [Type]
Government of Mongolia [Government Agency]
Implementing agencies [Type]
Mongolia Ministry of Energy [Government Agency]
Hunan Industrial Equipment Installation Company [State-owned Company]
China Energy Engineering Group Hunan Power Construction Co., Ltd [State-owned Company]
Loan Details
Maturity
20 years
Interest rate
2.0%
Grace period
7 years
Grant element (OECD Grant-Equiv)
41.4817%