China Eximbank provides $49.12 million preferential buyer’s credit for 35MW Erdenet Thermal Power Plant Expansion Project (Linked to Record ID#49148)

Commitments (Constant USD, 2023)$49,429,274
Commitment Year2018Country of ActivityMongoliaDirect Recipient Country of IncorporationMongoliaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Apr 9, 2018
Start (actual)
Mar 22, 2019
End (planned)
Dec 31, 2019
End (actual)
Sep 3, 2021
First repayment (originally scheduled)
Apr 7, 2025
Last repayment (originally scheduled)
Apr 4, 2038

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to expand the Erdenet Thermal Power Plant (Эрдэнэт ДЦС or Эрдэнэтская ТЭЦ or Эрдэнэтийн дулааны цахилгаан станцын) by installing a 35MW turbine generator with a CC-50 engine, refurbishing chemical and water purification facilities, constructing a water-cooling tower, and building a 110 kV overhead transmission line (measuring 3 km in length) and substation. This power plant is located in Erdenet, capital of Mongolia's northern province of Orkhon. Its exact locational coordinates are 49.0411, 104.09583. More detailed locational information can be found at https://www.openstreetmap.org/way/178171212

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Government of Mongolia

Implementing agencies

Government Agencies

  • Mongolia Ministry of Energy

State-owned companies

  • China Energy Engineering Group Hunan Power Construction Co., Ltd
  • Hunan Industrial Equipment Installation Company

Loan desecription

China Eximbank provides $49.12 million preferential buyer’s credit for 35MW Erdenet Thermal Power Plant Expansion Project

Grace period7 yearsGrant element56.0077%Interest rate (t₀)2%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On November 10, 2015, China Eximbank and the Government of Mongolia signed a general loan agreement regarding the utilization of a $1 billion preferential buyer's credit (PBC) loan for various projects (captured via Umbrella Record ID#49148). Under the terms of the general loan agreement, all subsidiary (individual) loan agreements for specific projects carry identical borrowing terms: a 20-year maturity, a 7-year grace period, a 2% interest rate, a 0% default (penalty) interest rate, a 0% management fee, and a 0.25% commitment fee. Then, on April 9, 2018, China Eximbank and the Government of Mongolia signed a subsidiary PBC agreement [CHINA EXIMBANK PBC 2018 (13) TOTAL NO. (470)] worth $49,120,000 for the 35MW Erdenet Thermal Power Plant Expansion Project. The proceeds of the PBC were to be used by the borrower to finance 95% of the cost of a $51.8 million commercial (EPC) contract between Mongolia’s Ministry of Energy, China Energy Engineering Group Hunan Power Construction Co., Ltd, and Hunan Industrial Equipment Installation Co., Limited, which was signed on January 17, 2017. The remaining 5% of the commercial contract cost was to be directly funded by the Government of Mongolia. The PBC (loan) agreement went into effect on July 27, 2018. The purpose of the project was to expand the coal-fired Erdenet Thermal Power Plant (Эрдэнэт ДЦС or Эрдэнэтская ТЭЦ or Эрдэнэтийн дулааны цахилгаан станцын) by installing a 35MW turbine generator with a CC-50 engine, refurbishing chemical and water purification facilities, constructing a water-cooling tower, and building a 110 kV overhead transmission line (measuring 3 km in length) and substation. This power plant is located in Erdenet, capital of Mongolia's northern province of Orkhon. Upon completion, this project was expected to increase the power plant's electricity production two-fold (from 36MW to 71MW). A groundbreaking ceremony took place on March 22, 2019 and construction originally expected to conclude by the end of 2019. However, a project completion and power plant commissioning ceremony did not take place until September 3, 2021.

Staff comments

1. This project is also known as the Erdenet Thermal Power Plant 35 MW Generator Installation Project. The Mongolian project title is “Эрдэнэтийн дулааны цахилгаан станцын өргөтгөл” төсөл or Эрдэнэтийн дулааны цахилгаан станцын шинэчлэл төсөл or Эрдэнэтийн дулааны цахилгаан станцын шинэчлэлтийн төсөл. 2. The China Eximbank loan for this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020. 3. Hunan Industrial Equipment Installation Company previously conducted an expansion of Thermal Power Plant No. 3 in Ulaanbaatar. 4. The PBC (loan) agreement can be accessed in its entirety via https://www.dropbox.com/s/a9zqkgbb1qnho1y/Mongolia%202018%20China%20Eximbank%20Loan%20for%20Erdenet%20Thermal%20Power%20Plant%20Modernization%20Project.pdf?dl=0. 5. The July 27, 2018 notice of the effectiveness of the April 9, 2018 loan agreement can be accessed via https://www.dropbox.com/scl/fi/jf5yaxdvzmufyoisbndwm/Notice-of-Effectiveness-of-Loan-Agreement-Erdenet-Power-Plant.pdf?rlkey=zqisqct2mepjhxmfbhrr88js1&dl=0 6. The November 10, 2015 general loan agreement can be accessed in its entirety via https://www.dropbox.com/scl/fi/6517ecol3fwzuqo536c54/Government-of-Mongolia-and-China-Eximbank-General-Loan-Agreement-November-2015.pdf?rlkey=9r8cibj3kt0v3d891n6hy33rb&dl=0. A May 4, 2017 amendment to the November 10, 2015 general loan agreement can be accessed in its entirety via https://www.dropbox.com/scl/fi/1055dq0pvwpxm45fk2fmk/Government-of-Mongolia-and-China-Eximbank-General-Loan-Agreement-2015_May_4_2017_Amendment-1.pdf?rlkey=hbj7c8wgm6udzr0icw8tufnwa&dl=0.