Overview

China Eximbank provides $249.5 million preferential buyer’s credit for Ulaanbaatar Central Wastewater Treatment Plant Construction Project (Linked to Record ID#69003)

Commitments (Constant USD, 2023)$257,494,569
Commitment Year2020Country of ActivityMongoliaDirect Recipient Country of IncorporationMongoliaSectorWater Supply And SanitationFlow TypeLoan

Status

Project lifecycle

Implementation

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 20, 2020
Start (actual)
Feb 28, 2019
End (planned)
Feb 28, 2022
First repayment
Jan 18, 2027
Last repayment
Jan 15, 2040

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

This project involves the construction of the Central Wastewater Treatment Plant in Songinokhairkhan District (Сонгинохайрхан дүүрэгт), Ulaanbaatar, Mongolia. More detailed locational info can be found at https://www.openstreetmap.org/way/1016676415

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

State-owned Policy Banks

  • Export-Import Bank of China (China Eximbank)

Receiving agencies

Government Agencies

  • Mongolia Ministry of Finance

Implementing agencies

State-owned companies

  • Beijing Construction Engineering Group Co., Ltd. (BCEG)
  • China Railway 4th Bureau Co., Ltd.
  • China Tiesiju Civil Engineering Group Co., Ltd.

Loan desecription

China Eximbank provides $249.5 million preferential buyer’s credit for Ulaanbaatar Central Wastewater Treatment Plant Construction Project

Grace period7 yearsGrant element56.0077%Interest rate (t₀)2%Interest typeFixed Interest RateMaturity20 years

Narrative

Full Description

Project narrative

On March 1, 2018, China Eximbank and the Government of Mongolia’s Ministry of Finance signed an RMB 1 billion government concessional loan (GCL) agreement for the Ulaanbaatar Central Wastewater Treatment Plant Construction Project. The GCL, captured via Record ID#69003, carries the following borrowing terms: a 20 year maturity, a 7 year grace period, and a 2% interest rate. Then, on January 20, 2020, China Eximbank and the Government of Mongolia’s Ministry of Finance signed a $249,574,613 preferential buyer’s credit (PBC) agreement [CHINA EXIMBANK PBC 2020 (1) TOTAL NO. (497)] for the Ulaanbaatar Central Wastewater Treatment Plant Construction Project. The PBC, captured via Record ID#91228, carries a 2% interest rate, a 0% default (penalty) interest rate, a 7-year grace period, a 20-year maturity, a 0.25% commitment fee, and a 0% management fee. It came into force on April 20, 2020. The proceeds of the GCL are to be used by the borrower to finance a commercial contract with China Tiesiju Civil Engineering Group (CTCE) and Beijing Construction Engineering Group (BCEG). The proceeds of the PBC are to be used by the borrower to finance 95% of the cost of a $262,710,119.53 commercial (EPC) contract (No. 26) with China Tiesiju Civil Engineering Group (CTCE) and Beijing Construction Engineering Group (BCEG), which was signed on February 1, 2019 and amended on March 29, 2019 (No. 53), May 15, 2019 (No. 2019/81), July 3, 2019 (No. 2019/129), and April 29, 2020 (No. 2020/101). The purpose of the project is to construct a wastewater treatment plant — with a daily capacity of 250,000 cubic meters of wastewater — on a 40-hectare site in Ulaanbaatar’s 20th subdistrict of Songinokharkhan district. CTCE and BCEG were the EPC contractors responsible for project implementation. A formal project commencement ceremony was held during Chinese Foreign Minister Wang Yi’s visit to Mongolia on August 27, 2018. Then, on February 28, 2019, a groundbreaking ceremony took place. Works were originally scheduled to last 36 months (expected completion date: February 28, 2022). However, project implementation stalled in mid-2020 due to the COVID-19 pandemic. Then, in July 2020, 24 technicians arrived to guide CTCE employees stationed there to resume construction. Construction restarted in August 2020. One month later, in September 2020, local engineering and technical staff were preparing the site for the construction of the first of the two biological treatment blocks. By August 2021, the project had achieved a 28 percent completion rate. Successful concrete pouring into the inner walls of three reaction tanks took place on March 31, 2022. The wastewater plant is currently scheduled to be handed over and put into operation on February 28, 2025. To date, the project has reportedly employed 50 foreign workers and 450 Mongolian workers. An Environmental Impact Assessment (EIA) for the project was conducted by Queen Nature LLC ("Хатан байгаль" ХХК) and approved on December 30, 2019.

Staff comments

1. This project is also known as the Central Wastewater Treatment Plant of Ulaanbaatar City Project or the New Central Waste Water Treatment Plant Construction Project in Ulaanbaatar City Project. The Chinese project title is 乌兰巴托中央污水处理厂 or 蒙古乌兰巴托市中央污水处理厂建设项目. The Mongolian project title is Улаанбаатар хотын төв цэвэрлэх байгууламжийг барих төсөл or УЛААНБААТАР ХОТЫН ТӨВ ЦЭВЭРЛЭХ БАЙГУУЛАМЖИЙГ ШИНЭЭР БАРИХ or Төв цэвэрлэх байгууламж. 2. The China Eximbank loan for this project is not included in the Overseas Development Finance Dataset published by Boston University’s Global Development Policy Center. 3. The PBC (loan) agreement can be accessed in its entirety via https://www.dropbox.com/s/saolzhmvvf6tiae/Mongolia%202020%20China%20Eximbank%20Loan%20for%20Construction%20of%20New%20Central%20Waste%20Water%20Treatment%20Plant%20in%20Ulaanbaatar%20City%20Project.pdf?dl=0.