Agricultural Bank of China provides $59 million loan for 55MW Penonomé I Wind Power Project

Commitments (Constant USD, 2023)$61,104,291
Commitment Year2013Country of ActivityPanamaDirect Recipient Country of IncorporationPanamaSectorEnergyFlow TypeLoan

Status

Project lifecycle

Completion

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jan 1, 2013
Last repayment (originally scheduled)
Dec 29, 2024

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project was to install 22 wind turbines with 55MW of capacity. The project also involved the construction of a shared substation facility. The wind turbines are spaced 200 meters apart from one another in a series of rows and have a tower height of 90 meters and a rotor blade diameter of 52.2 meters extending from the hub (nacelle). The project site is located in province of Coclé. It is adjacent to the Pan-American Highway and the national electric grid, which minimized the need for opening new rights-of-way and land acquisition in the area. Power is evacuated through two existing 230 kV transmission lines of the Central American Electrical Inter-Connection Transmission System (SIEPAC) managed by the Electric Transmission Company of Panama (ETESA). More detailed locational information can be found at https://www.openstreetmap.org/relation/12545467#map=14/8.4344/-80.3928

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Funding agencies

State-owned Commercial Banks

  • Agricultural Bank of China (ABC)

Receiving agencies

Joint Venture/Special Purpose Vehicles

  • UEP Penonomé I, S.A

Implementing agencies

Private Sector

  • Xinjiang Goldwind Science & Technology Co., Ltd.

Loan desecription

Agricultural Bank of China provides $59 million loan for 55MW Penonomé I Wind Power Project

Interest typeUnknownMaturity12 years

Narrative

Full Description

Project narrative

In 2013, the Agricultural Bank of China and UEP Penonomé I, S.A — a special purpose vehicle — signed a $59,096,700 loan agreement for the 55MW Penonomé I Wind Power Project. The loan’s final maturity date is 2025. The purpose of the project was to install 22 wind turbines with 55MW of capacity. The project also involved the construction of a shared substation facility. The wind turbines are spaced 200 meters apart from one another in a series of rows and have a tower height of 90 meters and a rotor blade diameter of 52.2 meters extending from the hub (nacelle). The project site is located in province of Coclé. It is adjacent to the Pan-American Highway and the national electric grid, which minimized the need for opening new rights-of-way and land acquisition in the area. Power is evacuated through two existing 230 kV transmission lines of the Central American Electrical Inter-Connection Transmission System (SIEPAC) managed by the Electric Transmission Company of Panama (ETESA). Xinjiang Goldwind Technology Co., Ltd. was the contractor responsible for implementation. The precise implementation start date is unknown. However, it is known that the wind farm was completed and went into operation in 2013. On April 28, 2020, AES Panamá acquired 100% of the participation quotas of UEP Penonomé I. Then, on June 19, 2020, AES Panamá and UEP Penonomé I entered into a merger agreement where AES Panamá absorbed UEP Penonomé. This merger agreement was registered in the mercantile registry of Panama City on June 23, 2020.

Staff comments

1. The Chinese project title is 新疆金风科技股份有限公司在巴拿马承建的风力发电项目. The Spanish project title is Parque eólico Penonomé. 2. UEP Penonomé I, S.A is also known as UEP Penonomé I, S. de R.L.