Project ID: 92261

China Eximbank contributes to $108 million syndicated buyer’s credit for Lai Chau 1200 MW Hydropower Plant Construction Project (Linked to Project ID #92260, #92262)

Commitment amount

$ 30456986.909125548

Adjusted commitment amount

$ 30456986.91

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Vietnam

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Central government-guaranteed debt

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2013-11-28

Actual start

2011-01-05

Actual complete

2017-12-20

Geography

Description

On July 10, 2013, Vietnam Electricity (EVN) — a Vietnamese state-owned power company — signed a VND 14.5 trillion ($700 million) commercial loan agreement with a syndicate of Vietnamese lenders for the 1200 MW Lai Chau Hydropower Plant Construction Project. The members of the lending syndicate included Vietnam Bank for Industry and Trade (VietinBank), Bank for Investment and Development of Vietnam (BIDV), and Vietnam Bank for Agriculture and Rural Development (Agribank). Then, on November 28, 2013, EVN signed a $108 million syndicated buyer’s credit (loan) agreement with Bank of China (BOC), China Eximbank, China Development Bank (CDB), and BNP Paribas for the 1200 MW Lai Chau Hydropower Plant Construction Project. This loan carried a 13 year maturity and an unknown interest rate. The Government of Vietnam issued a sovereign guarantee in support of the loan. The loan also benefited from a Sinosure credit insurance policy. The proceeds of the loan were to be used by the borrower to partially finance a $144.76 million commercial contract between EVN, Alstom, and Hydrochina Zhongnan Engineering Corporation, which was signed in January 2013. BOC's contribution is captured in Project ID #92260, China Eximbank's contribution is captured in Project ID #92261, and CDB's contribution is captured in Project ID #92262. The purpose of the project was to construct a 1200MW hydroelectric power plant — with three, 400MW power generation units (Unit 1, Unit 2, and Unit 3) — on the Da river in Nam Nhun district and Lai Chau province. Each 400MW Francis turbine was manufactured at the Alstom's plant in Tianjin, China. Power Construction Consulting Joint Stock Company No. 1 was the contractor responsible for project design. Song Da Corporation — a Vietnamese state-owned enterprise — was the general contractor responsible for implementation, but Vietnam Machinery Erection Corporation (LILAMA), Infrastructure Construction and Development Corporation, and Truong Son Construction Corporation were also involved in implementation. Son La PMB, Fichtner (Germany), and Son La Hydropower Company were responsible for project supervision. Alstom and Hydrochina Zhongnan Engineering Corporation were responsible for providing electromechanical equipment for the project. TBEA was responsible for providing 500kV transformer equipment. NHVS was responsible for providing 500 kV GIS equipment. Construction began on January 5, 2011. Stage 1 of the river blocking process commenced on April 24, 2012. Stage 2 of the river blocking process commenced on October 15, 2014. The first power generation unit (turbine) began generating power for the national grid on December 14, 2015. The second power generation unit (turbine) began generating power for the national grid on June 20, 2016. The third power generation unit (turbine) began generating power for the national grid on November 9, 2016. The power plant was formally inaugurated on December 21, 2016, one year ahead of schedule. However, the project was not completed until December 20, 2017. The power plant was expected, upon completion, to improve the irrigation water supply for downstream areas, especially in the dry season as well as river navigation and water supply for agriculture, among other socio-economic factors in the Lai Chau province. It is the third largest hydroelectric power station in Vietnam, generating more than 4.7 billion kWh every year to the national grid, and the third on the Da river. It is connected with the Hòa Bình Dam (completed in 1994) and the Sơn La Dam (inaugurated in 2012).

Additional details

1. The Chinese project title is 莱州水电站 or 莱州水电站项目. The Vietnamese project title is Nhà máy thủy điện Lai Châu. 2. The exact size of CDB, Bank of China, China Eximbank’s contributions to the loan syndicate are unknown. For the time being, AidData assumes that all four members of the lending syndicate contributed equal amounts (i.e. $27 million). This issue warrants further investigation. 3. This loan is not included in the China’s Overseas Development Finance Dataset that Boston University's Global Development Policy Center published in December 2020.

Number of official sources

11

Number of total sources

29

Download the dataset

Details

Cofinanced

Yes

Cofinancing agencies [Type]

Bank of China (BOC) [State-owned Commercial Bank]

China Development Bank (CDB) [State-owned Policy Bank]

BNP Paribas S.A. [Private Sector]

Vietnam Bank for Industry and Trade (VietinBank) [State-owned Bank]

Bank for Investment and Development of Vietnam (BIDV) [State-owned Bank]

Vietnam Bank for Agriculture and Rural Development (Agribank) [State-owned Bank]

Direct receiving agencies [Type]

Vietnam Electricity (EVN) [State-owned Company]

Implementing agencies [Type]

Vietnam Electricity (EVN) [State-owned Company]

PC1 Group Joint Stock Company (formerly Power Construction Consulting Joint Stock Company No. 1 [PCC1]) [State-owned Company]

Song Da Corporation Joint Stock Company [State-owned Company]

HydroChina International Engineering Co. Ltd [State-owned Company]

Alstom [Private Sector]

Fitchner Group [Private Sector]

Vietnam Machinery Erection Corporation (LILAMA Corporation) [State-owned Company]

Truong Son Construction Trading Investment Company Limited [Private Sector]

Son La Hydropower Company [Joint Venture/Special Purpose Vehicle]

TBEA Co., Ltd. [Private Sector]

New Northeast Electric Group High Voltage Switchgear Co., Ltd. (NHVS Group) [Private Sector]

Guarantee provider [Type]

Government of Viet Nam [Government Agency]

Insurance provider [Type]

China Export & Credit Insurance Corporation (Sinosure) [State-owned Company]

Loan Details

Maturity

13 years

Syndicated loan

Export buyer's credit

Investment project loan