Africa Growing Together Fund provides EUR 45.5 million loan for Secondary Cities Stormwater Drainage Project (PAPVS) (Linked to Umbrella Record ID#36104)

Commitments (Constant USD, 2023)$49,197,723
Commitment Year2023Country of ActivityBeninDirect Recipient Country of IncorporationMultiple JurisdictionsSectorWater Supply And SanitationFlow TypeLoan

Status

Project lifecycle

Implementation

Pipeline: PledgePipeline: CommitmentImplementationCompletion

Timeline

Key dates

Commitment date
Jul 17, 2023
Start (planned)
Jul 1, 2023
Start (actual)
Oct 22, 2024
End (planned)
Dec 1, 2027
First repayment (originally scheduled)
Jul 15, 2031
Last repayment (originally scheduled)
Jul 10, 2048

Geospatial footprint

Map overview

Visualizes the AidData-provided feature geometry for this project.

Loading map…

The purpose of the project is to develop stormwater drainage infrastructure in four cities: Porto-Novo, Ouidah, Bohicon and Abomey, with a combined population of around one million. More detailed locational information can be found at https://www.openstreetmap.org/relation/2945791, https://www.openstreetmap.org/relation/2946173, https://www.openstreetmap.org/relation/2946029, and https://www.openstreetmap.org/relation/2946027.

Stakeholders

Organizations involved in projects and activities supported by financial and in-kind transfers from Chinese government and state-owned entities

Ultimate beneficial owners

At least 25% host country ownership

Funding agencies

Government Agencies

  • People's Bank of China (PBC)

Cofinancing agencies

Intergovernmental Organizations

  • African Development Bank (AfDB) (ADB) (BAD)

Receiving agencies

Government Agencies

  • Government of Benin

Intergovernmental Organizations

  • Africa Growing Together Fund (AGTF)

Implementing agencies

Intergovernmental Organizations

  • Africa Growing Together Fund (AGTF)

Loan desecription

Africa Growing Together Fund provides EUR 45.5 million loan for Secondary Cities Stormwater Drainage Project (PAPVS)

Grace period8 yearsGrant element37.743%Interest rate (t₀)4.962%Interest typeVariable Interest RateLoan tenor6-month rateMaturity25 years

Narrative

Full Description

Project narrative

On May 22, 2014, the African Development Bank (AfDB) and the People's Bank of China (PBOC) signed an agreement for the Africa Growing Together Fund (AGTF) (see Umbrella Record ID#36104). The purpose of this $2 billion loan facility was to finance large development projects in Africa between 2014 and 2024. The AGTF is sponsored by the PBOC and administered by the AfDB. Then, on July 17, 2023, AGTF signed an EUR 45.5 million loan agreement [ID#5050200001752] with the Government of Benin for the Secondary Cities Stormwater Drainage Project (PAPVS). On the same day, the African Development Bank (AfDB) signed an EUR 118.75 million loan agreement [ID#2000200006056] with the Government of Benin for the same project. The borrowing terms of these loans are follows: an 25-year maturity, an 8-year grace period, an annual interest rate of EURIBOR plus an 1% margin, a 0.25% commitment fee, and a 0.25% upfront (management) fee. The first disbursements under both loan agreements took place on September 2, 2024. The purpose of the project is to develop stormwater drainage infrastructure in four cities: Porto-Novo, Ouidah, Bohicon and Abomey, with a combined population of around one million. Upon completion, the project is expected to improve the living conditions of the people in the target cities and strengthen their resilience to flooding. It has three components: the first involves stormwater drainage infrastructure and related works, such as the construction of 42.7 km of primary and secondary collectors (large culverts) and 62.3 km of culverts; the asphalting of 18.7 km; and the paving of 16.1 km of roads. It also covers the construction of 72 classrooms, 18 blocks of toilets with 36 hand-washing kits, housing for health workers, four drying sheds for fish smoking, two boreholes equipped with hand pumps, a public square and a public garden. Some 5,521 seedlings will be planted, in addition to the reforestation of 17.22 hectares. The various communities will be sensitized to prevent gender-based violence, including sexual harassment. The second component involves setting up a waste management and facility maintenance mechanism (training, equipment, elimination of existing dumps) that includes a gender dimension, and strengthening flood-risk warning and management system. A water retention basin and a market gardening area will be created. The third component covers project management, monitoring and evaluation. The project will significantly improve hygiene, help reduce water-borne diseases, and increase the enrollment and retention of girls in school. It will also foster employment opportunities. The project’s originally expected commencement and completion dates were July 2023 and December 2027, respectively. However, the project did not officially commence until October 22, 2024.

Staff comments

1. The AfDB project identification number is P-BJ-EBC-003. 2. The all-in interest rate (4.9%) was calculated by adding a 1% margin to the average 6-month EURIBOR rate in July 2023 (3.9%). 3. The margin of 1% is calculated by adding the Funding Cost Margin (unknown) to the Lending Margin (0.8%) and Maturity Premium (0.2%). 4. The French project title is Programme d’assainissement pluvial des villes secondaires.