Project ID: 98549

China Eximbank provides RMB 710 million overseas investment loan for Palembang Timur 150MW Gas-fired Power Plant Construction Project

Commitment amount

$ 208962751.09442738

Adjusted commitment amount

$ 208962751.09

Constant 2021 USD

Summary

Funding agency [Type]

Export-Import Bank of China (China Eximbank) [State-owned Policy Bank]

Recipient

Indonesia

Sector

Energy (Code: 230)

Flow type

Loan

Level of public liability

Unallocable

Infrastructure

Yes

Category

Intent

Mixed (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

OOF-like (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Completion (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2003-04-01

Actual start

2003-09-01

Actual complete

2004-08-31

Description

In 1996, PT Asrigita Prasarana, a subsidiary owned through PT Astratel. Nusantara (“Astratel”), entered into a Power Purchase Agreement with Persero — Indonesia’s state-owned power utility — for PT Asrigita Prasarana to design, finance, construct, own and operate the Palembang Timur 150MW Gas-fired Power Plant. However, due to unfavorable economic conditions in the country, the implementation of the project was postponed. Then, in March 2003, China Eximbank provided an RMB 710 million overseas investment loan to China National Chemical Engineering Co., Ltd. (CNCEC) for the the Palembang Timur 150MW Gas-fired Power Plant Construction Project. One month later, in April 2003, a consortium consisting of China National Chemical Corporation (CNCC) and Chengdu Engineering Corporation of China (CECC) acquired an 85% ownership stake in PT Asrigita Prasarana, a special purpose vehicle that is legally responsible for designing, implementing, and financing the Palembang Timur 150MW Gas-fired Power Plant Construction (IPP) Project on a BOOT basis. CNCEC on-lent the proceeds of the overseas investment loan to PT Asrigita Prasarana. The borrowing terms of the loan are unknown. However, it is known that Sinosure provided an insurance policy. The purpose of the project was to construct the Palembang Timur 150MW Gas-fired Power Plant in South Sumatra Province. CNCEC and CNCC were the contractors responsible for project implementation. Construction began in September 2003. The power plant was connected to the power grid on August 31, 2004 and officially inaugurated by Indonesia’s President on November 9, 2004.

Additional details

1. This project is also known as the  Palembang GFCC Power Plant . The Chinese project title is 以BOOT形式承揽印尼巨港电站项目 or 中国化学印尼巨港电站BOOT项目.

Number of official sources

12

Number of total sources

18

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

China National Chemical Engineering Corporation (CNCEC) [State-owned Company]

Indirect receiving agencies [Type]

PT Asrigita Prasarana [Joint Venture/Special Purpose Vehicle]

Implementing agencies [Type]

China National Chemical Engineering Corporation (CNCEC) [State-owned Company]

Chengdu Engineering Corporation Limited [State-owned Company]

Insurance provider [Type]

China Export & Credit Insurance Corporation (Sinosure) [State-owned Company]

Loan Details

Bilateral loan

Investment project loan