Project ID: 98665

China commits to fund the Tosagua Sewage Project and the Portovelo Potable Water Plant Improvement Project in 2001

Not recommended for aggregates

This project is not recommended for use in creating aggregated sums. See the documentation for more information about this criteria.

Summary

Funding agency [Type]

China Ministry of Commerce [Government Agency]

Recipient

Ecuador

Sector

Water supply and sanitation (Code: 140)

Flow type

Loan

Level of public liability

Central government debt

Infrastructure

No

Category

Intent

Development (The next section lists the possible statuses.)

Commercial

Development

Representational

Mixed

Financial Flow Classification

Vague (Official Finance) (The next section lists the possible statuses.)

Official Development Assistance

Other Official Flows

Vague (Official Finance)

Flows categorized based on OECD-DAC guidelines

Project lifecycle

Status

Cancelled (The next section lists the possible statuses.)

Pledge

Commitment

Implementation

Completion

Suspended

Cancelled

Milestones

Commitment

2001-12-26

Description

On May 23, 2001, and December 26, 2001, the governments of China and Ecuador signed and countersigned two separate sets of Letters of Exchange committing funds for two development projects (captured in this project). However, both of the projects described in these Letters were eventually cancelled at the request of the Government of Ecuador, but part of the projects' costs -- USD 228,500 already incurred by the Chinese government -- were still owed. In both cases, the original total project costs were unknown. The first was for the Tosagua Sewage Project (Proyecto del Alcantarillado de Tosagua), which was to include the construction of 12.5 km of rain pipes, 18.8 km of rainwater drainage ditches, 4 pumping stations, 23 km of water pipes, 5 integrated wastewater treatment stations, and laying asphalt for about 100,000 square meters of roads. It was to be funded, originally, through credit lines from Economic and Technical Cooperation Agreements (ETCA) signed April 16, 1996 and August 30, 1999. The second was for the Portovelo Drinking Water Plant Improvement Project, which included the construction of a coagulation and sedimentation tank, a guard house, four reinforced concrete tanks of 100 cubic meters, 2 reinforced concrete tanks of 50 cubic meters, 2 pump houses, and the rebuilding of an overflow dam. The project was originally to be funded by a credit line from an ETCA signed March 21, 1994. On November 14, 2011 and April 13, 2012, new Letters of Exchange were signed by the two governments, which officially cancelled the projects. However, a technical team had already been sent by the Chinese government to Ecuador at the end of 2001, in order to perform specific studies associated with both projects. As a result, the costs incurred by the Chinese government as a result of sending this team were charged to the March 21, 1994 interest-free credit line. The costs totaled 228,500 USD. The maturity period for this credit line was 20 years and the grace period 10 (captured in project #88261).

Number of official sources

4

Number of total sources

4

Download the dataset

Details

Cofinanced

No

Direct receiving agencies [Type]

Government of Ecuador [Government Agency]

Loan Details

Bilateral loan